The wet test run.

.

One side of the drainage trench was dug.

.

.

And the perforated pipe was attached to the catch basin and set in place.

.

.

The hose was deployed to simulate rain…

.

.

And water flowed.

.

.

When installation was deemed satisfactory, backfill was added.

.

.

From the lovely little plywood backed dirt piles .

.

.

Hard to believe this took two men almost 8 hours….

.

.

But when my husband is involved there will be some serious chatting along with the working.

😉

.