.
The day we’d been waiting for finally arrived .
A temporary mailbox had been installed…
.

.
The blockade was removed….
.

.
And paving commenced.
.

.
The crew pulled in at 7:30am with the big machine but a lot had to happen before they fired up that baby.
.

.
Spray painting for instance.
But when the dump truck with the hot tar arrived, things really kicked into high gear.
.
.
The bump out parking area was the first spot to be paved.
.

.
And I have to say … those laborers I photographed sitting down playing with their phones really earned their pay this day.
.

.
Time is of the essence when the tar is hot and they were positively trotting while dumping wheelbarrow after wheelbarrow full of the heavy stuff into place.
.

.
It’s a whole lotta work.
.

.
In front of the garage by the kitchen porch was next.
.

.
And I’m sure the crew thought the lady who lives here was nuts for running from window to window to take pictures of the progress.
.

.
A little portable packing and smoothing later, that section was done.
.