Driveway repair part nine…. finishing touches to dirt and the husband’s blockade.

.

The rough work on the driveway repair was coming to a close.

.

.

Small loads of the top layer of dirt were finessed.

.

.

With numerous wheelbarrow trips.

.

.

Though not everyone was hard at work.

.

.

Lots of dumping. Lots of spreading by hand.

.

.

And then the crew whipped out a big power saw and started cutting away part of the road.

.

.

I didn’t realize they were allowed to do that, but clearly they are.

.

.

And when I say cut, I mean rip up big chunks as well.

.

.

Nest step? Smooth and pack the dirt.

.

.

And at the end of the day we were left with this.

.

.

Which we were told was a little too wet to pave so it would have to sit for a few days to dry.

We were also told not to drive on it. And since a lot of people use our driveway to turn around?

.

.

The husband built a blockade.

.

14 thoughts on “Driveway repair part nine…. finishing touches to dirt and the husband’s blockade.”

  1. Let’s hope Mother Nature doesn’t rain on your ‘parkway’ the next “few days.” Meanwhile, I assume you’re having to drive over your lawn to get to the road to get to the store (or wherever you need to get).

    Liked by 1 person

Leave a comment