Beam/ceiling repair project day 5… no more hole.

.

Work continued on day 5, with the focus on prepping the surface for drywall.

.

.

We have one of those stupid popcorn ceilings and I’m not lying when I say it makes a mess.

.

.

But by the end of the day it was sufficiently scraped… and drywall covered the giant hole.

.

.

.

By removing all those stupid little pieces of useless plywood the contractor found up there, he was able to give the beam a much lower and less defined profile than it had before .

.

.

It’s still there, but no where near as deep, which is nice.

Next step will be mudding. (Which spellcheck just changed to muffins. You can never go wrong with muffins, but I don’t think they’d give us nearly the smooth finish we’re hoping for.)

.

.

The end should be in sight now…

Though I know His Lordship is going to miss the plastic room.

.