Beam/ceiling repair project day 9…. almost there.

.

We’ve turned a corner here at Casa River.

.

.

A bright clean white corner.

.

.

The beam has been painted and the ceiling primed for popcorn. Things are looking up.

And by that, I mean I try not to look down because even though a plastic barrier wall was erected… everything is covered in drywall dust.

.

.

Every single nook and cranny.

.

.

Sigh…

🥴

.

11 thoughts on “Beam/ceiling repair project day 9…. almost there.”

  1. I know the feeling and commiserate…my “better half” is currently pointing the stone wall entrance, which is right in the middle of our 200 year old house.

    Liked by 1 person

Leave a comment