One side of the drainage trench was dug.
.

.
And the perforated pipe was attached to the catch basin and set in place.
.

.
The hose was deployed to simulate rain…
.

.
And water flowed.
.

.
When installation was deemed satisfactory, backfill was added.
.

.
From the lovely little plywood backed dirt piles .
.

.
Hard to believe this took two men almost 8 hours….
.

.
But when my husband is involved there will be some serious chatting along with the working.
😉
.
It would have taken my husband six months!